  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

  

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

  

主站蜘蛛池模板: 亚洲高清国产一线久久 | 免费一级毛片在线播放 | 在线播放亚洲美女视频网站 | 综合网自拍 | 久久免费观看国产精品 | 欧美1314性欧美 | 国产在线视频h | 欧美另类孕交 | 一级毛片在线完整免费观看 | 韩国免费一级成人毛片 | 久久久久久一品道精品免费看 | 91热久久免费频精品动漫99 | 久草免费资源在线 | 亚洲一区二区影视 | 欧美日韩99 | 国内精品久久久久久久影视麻豆 | 亚洲欧美一区二区三区在线播放 | 一级成人a毛片免费播放 | 女人毛片a毛片久久人人 | 国产99视频精品免费观看7 | 久久亚洲国产精品五月天 | 国产欧美精品一区二区三区 | 黄色在线播放 | 午夜大片免费男女爽爽影院久久 | 国产理伦| 天堂男人2021av | 中文字幕一区二区三区在线观看 | 国产99视频在线观看 | 欧美在线一区二区三区不卡 | 国产精品久久久久久一区二区三区 | 久久久久久极精品久久久 | 国内精品福利视频 | 久久精品爱国产免费久久 | 欧美日韩精品一区二区在线线 | 亚洲国产欧美精品 | 日韩在线亚洲 | 欧美国产成人精品一区二区三区 | 99视频在线免费观看 | 99精品视频在线免费观看 | 欧美成人做性视频在线播放 | 香蕉久久一区二区不卡无毒影院 |