久久一区二区三区精品-久久一区二区明星换脸-久久一区二区精品-久久一区不卡中文字幕-91精品国产爱久久久久久-91精品国产福利尤物免费

四級沖刺練習閱讀(75)

雕龍文庫 分享 時間: 收藏本文

四級沖刺練習閱讀(75)

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

信息流廣告 競價托管 招生通 周易 易經(jīng) 代理招生 二手車 網(wǎng)絡(luò)推廣 自學教程 招生代理 旅游攻略 非物質(zhì)文化遺產(chǎn) 河北信息網(wǎng) 石家莊人才網(wǎng) 買車咨詢 河北人才網(wǎng) 精雕圖 戲曲下載 河北生活網(wǎng) 好書推薦 工作計劃 游戲攻略 心理測試 石家莊網(wǎng)絡(luò)推廣 石家莊招聘 石家莊網(wǎng)絡(luò)營銷 培訓(xùn)網(wǎng) 好做題 游戲攻略 考研真題 代理招生 心理咨詢 游戲攻略 興趣愛好 網(wǎng)絡(luò)知識 品牌營銷 商標交易 游戲攻略 短視頻代運營 秦皇島人才網(wǎng) PS修圖 寶寶起名 零基礎(chǔ)學習電腦 電商設(shè)計 職業(yè)培訓(xùn) 免費發(fā)布信息 服裝服飾 律師咨詢 搜救犬 Chat GPT中文版 語料庫 范文網(wǎng) 工作總結(jié) 二手車估價 情侶網(wǎng)名 愛采購代運營 情感文案 古詩詞 邯鄲人才網(wǎng) 鐵皮房 衡水人才網(wǎng) 石家莊點痣 微信運營 養(yǎng)花 名酒回收 石家莊代理記賬 女士發(fā)型 搜搜作文 石家莊人才網(wǎng) 銅雕 關(guān)鍵詞優(yōu)化 圍棋 chatGPT 讀后感 玄機派 企業(yè)服務(wù) 法律咨詢 chatGPT國內(nèi)版 chatGPT官網(wǎng) 勵志名言 兒童文學 河北代理記賬公司 教育培訓(xùn) 游戲推薦 抖音代運營 朋友圈文案 男士發(fā)型 培訓(xùn)招生 文玩 大可如意 保定人才網(wǎng) 黃金回收 承德人才網(wǎng) 石家莊人才網(wǎng) 模型機 高度酒 沐盛有禮 公司注冊 造紙術(shù) 唐山人才網(wǎng) 沐盛傳媒
主站蜘蛛池模板: 波多野结衣视频免费在线观看 | 成人免费国产欧美日韩你懂的 | 精品视频在线免费看 | 久久99精品视香蕉蕉 | 美女一级毛片免费观看 | 欧美白人和黑人xxxx猛交视频 | 亚洲精品一区国产二区 | 久草久草 | 久久久久久久国产视频 | 一区二区三区欧美视频 | 国产91无套剧情在线播放 | 亚洲 欧美 日韩在线 | 亚洲日本中文字幕在线 | 国产精品videosse | 国产成人精品本亚洲 | 日日a.v拍夜夜添久久免费 | 美女一级ba大片免色野外 | 欧美视频在线观在线看 | 国产精品久久久精品视频 | 成人久久网 | 99re6这里有精品热视频在线 | 在线观看中文字幕亚洲 | 久久国产免费一区 | 久草免费看 | 六月丁香婷婷天天在线 | 久久久久久在线 | 极品色在线精品视频 | 亚洲欧洲久久久精品 | 久久久小视频 | 草草影院欧美三级日本 | 一级在线视频 | 久草在线资源网站 | 欧美成人免费网在线观看 | 亚洲综合网址 | 日韩成人毛片高清视频免费看 | 成 人 黄 色 免费网 | 欧美jizzhd精品欧美高清 | 亚洲成av人影片在线观看 | 久久99久久99精品 | 一区二区中文字幕亚洲精品 | 色综合精品久久久久久久 |